Fix MI State
  • What’s broken?
    • Why is infrastructure important?
    • Stormwater & Wastewater
    • Drinking Water & Beaches
    • Roads & Bridges
    • Dams & More
  • How do we fix it?
    • Fixing What We Can
    • Help Fix MI State
  • What’s new?
    • Reports & Research
    • Video Gallery
    • Road Funding FAQs
Select Page
Freeways flood as thunderstorms drench Wayne County

Freeways flood as thunderstorms drench Wayne County

by Fix MI State | Aug 2, 2017 | Roads & Bridges, Stormwater & Wastewater

Storms that hit metro Detroit this evening sent lightning cracking to the ground and caused street flooding in Wayne County, snarling drivers at the peak of rush hour. More rain could fall Thursday before temperatures cool down this weekend. The storms that began...
US-2 BR resurfacing in Ironwood starts August 9

US-2 BR resurfacing in Ironwood starts August 9

by Fix MI State | Aug 1, 2017 | Roads & Bridges

IRONWOOD, Mich. (WLUC) – The Michigan Department of Transportation (MDOT) is resurfacing 1.3 miles of US-2 BR from US-2 to the Wisconsin state line in Ironwood. MDOT will invest $673,000 to mill and resurface the roadway, make drainage structure repairs and...
Lake St. Clair Metro Park closed for 3rd time this month for E. coli levels

Lake St. Clair Metro Park closed for 3rd time this month for E. coli levels

by Fix MI State | Jul 31, 2017 | Michigan beaches, Drinking Water & Recreational Waters, Dams & Other, Stormwater & Wastewater

(WJBK) – Deep in the heat of a Michigan summer and there is something you count on – the beach at Lake St. Clair Metro Park will be closed for swimming. The beach is closed due to high levels of E. coli, a bacteria that can come from many sources,...
Sinkhole to force rerouting of traffic to Charlotte’s largest employer

Sinkhole to force rerouting of traffic to Charlotte’s largest employer

by Fix MI State | Jul 28, 2017 | Roads & Bridges, Dams & Other

CHARLOTTE – A deteriorating section of drain that’s nearly 150 years old has created a six-foot wide sinkhole in the middle of a roadway on the city’s west side and fixing it will mean rerouting traffic to and from the city’s largest employer....
Traffic Alert: Ramp, Lane Closures On I-75 And The Lodge This Weekend

Traffic Alert: Ramp, Lane Closures On I-75 And The Lodge This Weekend

by Fix MI State | Jul 27, 2017 | Roads & Bridges

DETROIT (WWJ) – Heads up if your plans include freeway travel in the downtown Detroit area this weekend. The Michigan Department of Transportation (MDOT) says several lane and ramp closures are scheduled starting Friday night for construction work on the northbound...
Study finds contaminants in Mich. water supplies

Study finds contaminants in Mich. water supplies

by Fix MI State | Jul 27, 2017 | Michigan beaches, Drinking Water & Recreational Waters

Drinking water in Michigan meets most federal guideline standards for quality but does have certain levels of contaminants in it that could be harmful over time, according to a national water study released Wednesday. The analysis by the Washington, D.C.-based...
Michigan road projects: What to know for the rest of 2017

Michigan road projects: What to know for the rest of 2017

by Fix MI State | Jul 25, 2017 | Roads & Bridges

DETROIT – We’re entering the second half of 2017 in Michigan and the road work is not finished yet. Several projects will start in the coming months and will continue through the end of the year. The biggest 2017 project has already started, as I-75...
Kalamazoo crews clean wastewater, sewage spills Monday

Kalamazoo crews clean wastewater, sewage spills Monday

by Fix MI State | Jul 25, 2017 | Stormwater & Wastewater

KALAMAZOO, Mich. (NEWSCHANNEL 3) – A portion of a Kalamazoo road is back open tonight after sewage overflows onto the street. It happened shortly before 11 a.m. Monday, on Mount Olivet Road, at Spring Valley Park. Nearly 300 gallons of sewage leaked out of a...
Daily M-43 lane closures as construction heads east in Kalamazoo

Daily M-43 lane closures as construction heads east in Kalamazoo

by Fix MI State | Jul 23, 2017 | Roads & Bridges

KALAMAZOO, MI — A $2.5 million construction project on M-43 through Kalamazoo continues, causing single-lane closures on West Main Street east of Kendall Avenue. Starting Monday, July 24, motorists will experience closures from 9 a.m. to 3 p.m. on M-43 east of...
Rotting wetlands grasses fouling part of Michigan beach

Rotting wetlands grasses fouling part of Michigan beach

by Fix MI State | Jul 22, 2017 | Michigan beaches, Drinking Water & Recreational Waters

GRAND HAVEN, Mich. — Rotting vegetation is making it tough for visitors to enjoy part of one western Michigan beach along Lake Michigan. WOOD-TV reports that weeds along part of Grand Haven State Park are making it unpleasant to swim and have been clouding up the...
« Older Entries
Next Entries »

Regions

  • Central MI
  • East MI
  • Northern Lower MI
  • South MI
  • Southeast MI
  • Statewide
  • Upper Peninsula
  • West MI

Infrastructure Type

  • Aggregate Mining
  • Construction Profiles
  • Dams & Other
  • Michigan beaches, Drinking Water & Recreational Waters
  • Press Releases & Statements
  • Roads & Bridges
  • Stormwater & Wastewater
  • Uncategorized
  • Work Zone Safety
  • Over 100 Michigan bridges still face future closures due to funding gaps

    February 6, 2026

    This article originally appeared in CBS Detroit. Read more here. ... read more

see all

Dig Deeper

Get infrastructure news from your region. Subscribe to our Dig Deeper e‑newsletter.

Regions






Get Informed

Read the latest reports and research on Michigan's infrastructure.

learn more
  • About us
  • Contact us
Copyright © 2021 MITA