by Fix MI State | Aug 21, 2017 | Roads & Bridges
ST. IGNACE, Mich. (WLUC) – Contractors for the Michigan Department of Transportation (MDOT) will begin asphalt paving work on I-75 Business Loop (BL) this week. The work will result in traffic restrictions. The contractor has been maintaining driveway access and...
by Fix MI State | Aug 17, 2017 | Roads & Bridges
WELLS — The Michigan Department of Transportation (MDOT) plans to completely close the Escanaba River Bridge between Escanaba and Gladstone from 9 p.m. on Sept. 5 to 6 a.m. on Sept. 8. The closure had originally been planned for August, according to MDOT...
by Fix MI State | Aug 1, 2017 | Roads & Bridges
IRONWOOD, Mich. (WLUC) – The Michigan Department of Transportation (MDOT) is resurfacing 1.3 miles of US-2 BR from US-2 to the Wisconsin state line in Ironwood. MDOT will invest $673,000 to mill and resurface the roadway, make drainage structure repairs and...
by Fix MI State | Jul 13, 2017 | Roads & Bridges, Dams & Other
MENOMINEE, Mich. (WLUK) — A 10-block stretch of road is closed in Menominee, Michigan, after a sinkhole opened up. City officials say the sinkhole was discovered overnight on 13th Street. It covers about a five-square-foot area and is about three feet deep. The...
by Fix MI State | Jun 28, 2017 | Roads & Bridges
SKANDIA — The M-94 Bridge over the Chocolay River is officially open over two weeks ahead of schedule, after a $1.8 million project. This bridge covering the east branch of the Chocolay River, was closed back in October after a four-culvert system failed during a...