Fix MI State
  • What’s broken?
    • Why is infrastructure important?
    • Stormwater & Wastewater
    • Drinking Water & Beaches
    • Roads & Bridges
    • Dams & More
  • How do we fix it?
    • Fixing What We Can
    • Help Fix MI State
  • What’s new?
    • Reports & Research
    • Video Gallery
    • Road Funding FAQs
  • Take Action
  • Pothole Payback
Select Page
Pavement repairs to slow traffic in Davison area

Pavement repairs to slow traffic in Davison area

by Fix MI State | Nov 20, 2017 | Roads & Bridges, Dams & Other

GENSEEE COUNTY, MI — A lane of traffic is scheduled to close Tuesday, Nov. 21 at an intersection on the borders of Davison and Richfield townships to allow for pavement repairs needed after installation of a portion of the Karegnondi Water Authority pipeline....
Failing infrastructure buried no longer

Failing infrastructure buried no longer

by Fix MI State | Nov 19, 2017 | Roads & Bridges, Michigan beaches, Drinking Water & Recreational Waters, Stormwater & Wastewater

It took driving on potholed roads for years to awaken Michigan residents to the need for infrastructure investment that was visible to the eye. The same message about infrastructure we can’t see has gone unheeded for years, despite Flint and Fraser. Perhaps with...
Major I-75 project in Michigan passes midway point

Major I-75 project in Michigan passes midway point

by Fix MI State | Nov 19, 2017 | Roads & Bridges

The Michigan Department of Transportation’s massive bridge project that has closed southbound I-75 south of Detroit since February has passed its midway point, and a project official is cautiously optimistic it could be finished ahead of schedule. But that’s going to...
Michigan opens ‘flex route’ on U.S. 23 to ease traffic congestion

Michigan opens ‘flex route’ on U.S. 23 to ease traffic congestion

by Fix MI State | Nov 15, 2017 | Roads & Bridges

The state’s new Flex Route system on U.S. 23 near Ann Arbor began operations this morning. The Michigan Department of Transportation opened the special lanes for the first time in an attempt to ease traffic congestion caused by rush hour or crashes. The...
W. Michigan Avenue project to finish in mid-December, two-way conversion delayed

W. Michigan Avenue project to finish in mid-December, two-way conversion delayed

by Fix MI State | Nov 14, 2017 | Roads & Bridges

JACKSON, MI – Nearly seven months after construction began, W. Michigan Avenue is still closed in Jackson. But the road is scheduled to reopen by mid-December, Michigan Department of Transportation Engineer Ken Koepke said. The conversion of the downtown loop at...
How to drive on the U.S. 23 Flex Route north of Ann Arbor

How to drive on the U.S. 23 Flex Route north of Ann Arbor

by Fix MI State | Nov 10, 2017 | Roads & Bridges

ANN ARBOR, MI – The state is almost done adding a third lane in both directions to U.S. 23 north of Ann Arbor. It’s designed to ease traffic congestion, but it’s not a standard highway travel lane. The so-called “Flex Route” is an extra...
« Older Entries
Next Entries »

Regions

  • Central MI
  • East MI
  • Northern Lower MI
  • South MI
  • Southeast MI
  • Statewide
  • Upper Peninsula
  • West MI

Infrastructure Type

  • Aggregate Mining
  • Construction Profiles
  • Dams & Other
  • Michigan beaches, Drinking Water & Recreational Waters
  • Press Releases & Statements
  • Roads & Bridges
  • Stormwater & Wastewater
  • Uncategorized
  • Work Zone Safety
  • Michigan roads receiving $2 billion more for repairs

    October 17, 2025

    This article originally appeared in ABC 12 News. Read more... read more

see all

Dig Deeper

Get infrastructure news from your region. Subscribe to our Dig Deeper e‑newsletter.

Regions






Get Informed

Read the latest reports and research on Michigan's infrastructure.

learn more
  • About us
  • Contact us
Copyright © 2021 MITA